Current time: Refresh

Agencies » Vancouver TransLink

Remove ads by becoming a Premium User

 • : 20-Victoria/Downtown at Bay 3 on Commercial-Broadway Station going 20 Downtown

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 0:00 Mins
at . Cancelled 1:08 behind Vehicle 2523 Load 114%? Last seen 1:03:39

2: 6 Mins
at . 2:06 behind Vehicle 2528 Load 299%? Last seen 1:21

3: 20 Mins
at . 0:03 behind Vehicle 2513 Load 87%?

4: 44 - 55 Mins
at . 12:19 behind Vehicle 2566 Load 182%? Last seen 1:33

5: 50 Mins
at . 0:00 behind Vehicle 2517 Load 18%? Last seen 1:44

Stop 50931 Eastbound W Hastings St @ Homer St is temporarily closed from Fri Jun 14 through Fri Jun 28 all day and daily due to construction. Started Jun 14 Until Jun 29
More...
Stop 50930 Eastbound W Hastings St @ Seymour St is temporarily closed from Thu Jun 27 to Fri Jun 28, 10am-3pm daily, due to construction. Starts Jun 27 Until Jun 28
20 Downtown trip leaving Westbound Harrison Dr @ Victoria Dr at 10:50 am is cancelled today due to mechanical issue. Started Until

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.