Current time: Refresh

Agencies » Los Angeles Metro

Remove ads by becoming a Premium User

 • : Metro C Line at Harbor Freeway Station going

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 0:24 Mins
at . 4:02 behind Vehicle 1182-1186 Load 91%?

2: 14 Mins
at . 2:13 behind Vehicle 302 Load 79%?

3: 25 - 26 Mins
at . 2:53 behind Vehicle 306 Load 73%?

4: 28 - 32 Mins
at . 1:16 behind Vehicle 1183-1191 Load 21%? Last seen 1:59

5: 41 - 45 Mins
at . 4:12 behind Vehicle 1189-1207 Load 87%?

C Line notice: Now thru Oct 27 from open-9pm, service will operate every 16 minutes due to power system upgrades. Trains share 1 track at Willowbrook/Rosa Park and Long Beach Blvd Station. Started Tue Sep 3 Until Sun Oct 27 (Updated Mon Sep 9 )

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.