Current time: Refresh

Agencies » Los Angeles Metro

Remove ads by becoming a Premium User

 • : Metro C Line at El Segundo Station going

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 2 Mins
at . 6:33 behind Vehicle 1195-1197 Load 80%?

2: 17 - 19 Mins
at . 5:45 behind Vehicle 1188-1196 Load 100%?

3: 30 - 35 Mins
at . 5:06 behind Vehicle 1202-1204 Load 77%?

4: 45 - 53 Mins
at . 4:39 behind Vehicle 1200-1206 Load 97%?

5: 1h04 - 1h12 Mins
at . 8:30 behind Vehicle 1194-1208 Load 124%?

C Line notice: Now thru Oct 27 from open-9pm, service will operate every 16 minutes due to power system upgrades. Trains share 1 track at Willowbrook/Rosa Park and Long Beach Blvd Station. Started Tue Sep 3 Until Sun Oct 27 (Updated Mon Sep 9 )

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.