Current time: Refresh

Agencies » Los Angeles Metro

Remove ads by becoming a Premium User

 • : Metro C Line at Aviation / LAX Station going

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 0:42 Mins
at . 2:22 behind Vehicle 1200-1206 Load 97%?

2: 15 - 18 Mins
at . 2:05 behind Vehicle 1194-1208 Load 85%?

3: 31 - 38 Mins
at . 5:14 behind Vehicle 1195-1197 Load 120%?

4: 47 - 52 Mins
at . 2:46 behind Vehicle 1188-1196 Load 85%?

5: 1h05 - 1h09 Mins
at . 5:45 behind Vehicle 1202-1204 Load 119%?

C Line notice: Now thru Oct 27 from open-9pm, service will operate every 16 minutes due to power system upgrades. Trains share 1 track at Willowbrook/Rosa Park and Long Beach Blvd Station. Started Tue Sep 3 Until Sun Oct 27 (Updated Mon Sep 9 )

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.