Current time: Refresh

Agencies » Halifax Transit

Remove ads by becoming a Premium User

 • : 39-Flamingo at Langbrae Dr on Parkland Dr going 39 Bridge Terminal Via Mackay Bridge

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 27 - 38 Mins
at . 5:36 behind Vehicle 1224 Load 116%?

2: 55 - 57 Mins
at . 0:55 behind Vehicle 1084 Load 85%?

Stop closure Pinecrest Dr After Brule St (7451) is closed for construction Started Thu Aug 22 Until Wed Jan 1 3000
More...

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.