Current time: Refresh

Agencies » Los Angeles Metro

Remove ads by becoming a Premium User

 • : Metro C Line at Vermont / Athens Station going

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 11 Mins
at . 0:52 behind Vehicle 1198-1199 Load 143%?

2: 15 Mins
at . Waiting 10:35. 0:07 behind Vehicle 1200-1206 Load 31%?

3: 26 Mins
at . 0:18 ahead of Vehicle 1182-1186 Load 143%?

4: 31 Mins
at . 0:00 behind Vehicle 1183-1191 Load 72%?

5: 42 - 55 Mins
at . 1:06 behind Vehicle 1189-1207 Load 164%?

C Line notice: Now thru Oct 27 from open-9pm, service will operate every 16 minutes due to power system upgrades. Trains share 1 track at Willowbrook/Rosa Park and Long Beach Blvd Station. Started Tue Sep 3 Until Sun Oct 27 (Updated Mon Sep 9 )

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.