Current time: Refresh

Agencies » Los Angeles Metro

Remove ads by becoming a Premium User

 • : Metro C Line at Vermont / Athens Station going

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 8 - 10 Mins
at . 5:19 behind Vehicle 1189-1207 Load 106%?

2: 21 - 35 Mins
at . 4:15 behind Vehicle 1182-1186 Load 115%?

3: 35 - 42 Mins
at . 2:07 behind Vehicle 302 Load 107%?

4: 48 - 53 Mins
at . 2:55 behind Vehicle 306 Load 91%?

5: 51 - 57 Mins
at . 1:53 behind Vehicle 1183-1191 Load 31%?

C Line notice: Now thru Oct 27 from open-9pm, service will operate every 16 minutes due to power system upgrades. Trains share 1 track at Willowbrook/Rosa Park and Long Beach Blvd Station. Started Tue Sep 3 Until Sun Oct 27 (Updated Mon Sep 9 )

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.