• : Metro C Line at Avalon Station going
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 5 Mins
at . 0:12 behind Vehicle 1188-1196 Load 110%?
2: 9 Mins
at . 0:18 ahead of Vehicle 1195-1197 Load 65%?
3: 20 Mins
at . Waiting 7:29. 0:00 behind Vehicle 1200-1206 Load 120%?
4: 25 Mins
at . 0:00 behind Vehicle 1194-1203 Load 57%?
5: 36 Mins
at . 0:00 behind Vehicle 1183-1191 Load 125%? ↩
C Line notice: Now thru Oct 27 from open-9pm, service will operate every 16 minutes due to power system upgrades. Trains share 1 track at Willowbrook/Rosa Park and Long Beach Blvd Station. Started Tue Sep 3 Until Sun Oct 27 (Updated Mon Sep 9 )
Add stop (different agency)