Current time: Refresh

Agencies » Los Angeles Metro

Remove ads by becoming a Premium User

 • : Metro C Line at Norwalk Station going

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 9 Mins
at . 5:12 behind Vehicle 1194-1203 Load 108%?

2: 25 - 27 Mins
at . 1:44 behind Vehicle 1198-1199 Load 93%?

3: 45 - 49 Mins
at . Waiting 7:10. 2:20 behind Vehicle 1182-1186 Load 103%? Last seen 7:10

4: 1h05 - 1h11 Mins
at . 2:45 behind Vehicle 1202-1204 Load 102%?

5: 1h26 - 1h31 Mins
at . 3:46 behind Vehicle 1195-1197 Load 105%?

C Line notice: Now thru Oct 27 from open-9pm, service will operate every 16 minutes due to power system upgrades. Trains share 1 track at Willowbrook/Rosa Park and Long Beach Blvd Station. Started Tue Sep 3 Until Sun Oct 27 (Updated Mon Sep 9 )

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.