Current time: Refresh

Agencies » Toronto TTC

Monday, June 17, to Thursday, June 20, subway service on Line 1 between Sheppard West and Finch West stations will be adjusted nightly starting at 11 p.m. for planned tunnel work. Regular subway service will resume the following morning at 6 a.m. See other service alerts. (Updated Jun 14 )
Monday, June 17, to Friday, June 21, subway service on Line 1 between St Clair and College stations will end at 11 p.m. for planned track work. Shuttle buses will operate. Regular subway service will resume at 6 a.m. See other service alerts. (Updated Jun 14 )

Remove ads by becoming a Premium User

 • : 123-Sherway at Gair Dr on Evans Ave

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 3 Mins
at . (Sched. based) 0:00 behind Vehicle 8216 Load 177%? North to Kipling Station via East Mall and Shorncliffe

2: 7 Mins
at . 1:09 ahead of Vehicle 8309 123C South to Long Branch via Shorncliffe and North Queen

3: 26 Mins
at . (Sched. based) 0:00 behind Vehicle 3346 North to Kipling Station via East Mall and Shorncliffe

4: 30 Mins
at . 0:55 ahead of Vehicle 8189 Load 101%? 123C South to Long Branch via Shorncliffe and North Queen

5: 49 Mins
at . (Sched. based) 0:00 behind Vehicle 8216 North to Kipling Station via East Mall and Shorncliffe

Vehicle 8189 past Subway Cres on Dundas St West heading North

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.