Current time: Refresh

Agencies » Sydney Trains

Remove ads by becoming a Premium User

 • : T5-Cumberland Line at Warwick Farm Station going Schofields

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 6 Mins
at . 1:05 ahead of Vehicle 8144.9631.7838.4206 Load 263%? Platform 1

2: 7 Mins
at . 0:00 behind Vehicle 9760 Load 4%? Platform 1 In long layover, last seen 20:04

3: 42 Mins
at . 5:18 behind Vehicle 9447.8726.9837.1975 Load 118%? Platform 1

4: 1h09 Mins
at . 2:17 behind Vehicle 5040 Load 90%? Platform 1 In long layover, last seen 55:51

5: 1h16 Mins
at . 8:49 behind Vehicle 9407.9331.2183.7402.3962.1794.8517.9693 Load 22%? Platform 1

Running late Started Jul 17 2022
due to a person needing medical assistance at Central.
General update Started Jul 22 2022
The 2nd carriage is unavailable. Please move along the platform to board another available carriage.

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.