Current time: Refresh

Agencies » Sydney Trains

Remove ads by becoming a Premium User

 • : T5-Cumberland Line at Warwick Farm Station

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 15 Mins
at . 0:30 ahead of Vehicle 5638.9498.6843.4395 Platform 2 Leppington

2: 20 Mins
at . 3:51 behind Vehicle 8839 Load 15%? Platform 2 Leppington In long layover, last seen 41:27

3: 45 - 49 Mins
at . 0:11 behind Vehicle 6971.9893.3951.9309 Load 88%? Platform 2 Leppington Last seen 10:48

4: 50 Mins
at . 3:53 behind Vehicle 2342 Load 12%? Platform 2 Leppington In long layover, last seen 11:25

5: 1h22 Mins
at . 5:48 behind Vehicle 7451.8964.3872.1417.5714.9248.3678.9612 Load 106%? Platform 2 Leppington

Running late Started Sun Jul 17 2022
due to a person needing medical assistance at Central.
General update Started Fri Jul 22 2022
The 2nd carriage is unavailable. Please move along the platform to board another available carriage.

Vehicle 8839 aprchg Schofields Station heading North

Vehicle 2342 aprchg Schofields Station heading North

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.