Current time: Refresh

Agencies » Durham Region Transit

Remove ads by becoming a Premium User

 • : 900-PULSE 900 at Thickson on Dundas

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 3 - 5 Mins
at . 1:30 behind Vehicle 8524 Load 99%? B - Pickering Parkway Terminal

2: 13 - 20 Mins
at . 2:46 behind Vehicle 6128 Load 113%? B - Pickering Parkway Terminal

3: 21 - 28 Mins
at . 3:53 behind Vehicle 9106 Load 91%? Scarborough In long layover, last seen 10:19

4: 33 - 39 Mins
at . 2:35 behind Vehicle 8523 Load 107%? B - Pickering Parkway Terminal In long layover, last seen 4:20

5: 44 - 50 Mins
at . 3:10 behind Vehicle 8612 Load 106%? B - Pickering Parkway Terminal

DRT Service Started Aug 29 2023 Until Sep 5 2023
Durham Region Transit has resumed regular service.

Service updates take effect on September 5.

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.