Current time: Refresh

Agencies » Los Angeles Metro

Remove ads by becoming a Premium User

 • : Metro C Line at Vermont / Athens Station going

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 1:16 Mins
at . 1:28 behind Vehicle 1183-1191 Load 101%?

2: 16 Mins
at . 1:06 behind Vehicle 1202-1204 Load 99%?

3: 30 - 36 Mins
at . 5:14 behind Vehicle 1195-1197 Load 107%?

4: 31 Mins
at . 0:00 behind Vehicle 1189-1207 Load -14%?

5: 49 - 58 Mins
at . 4:43 behind Vehicle 1188-1196 Load 129%?

C Line notice: Now thru Oct 27 from open-9pm, service will operate every 16 minutes due to power system upgrades. Trains share 1 track at Willowbrook/Rosa Park and Long Beach Blvd Station. Started Tue Sep 3 Until Sun Oct 27 (Updated Mon Sep 9 )

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.