Current time: Refresh

Agencies » Los Angeles Metro

Remove ads by becoming a Premium User

 • : Metro C Line at Redondo Beach Station going

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 0:00 Mins
at . 6:15 behind Vehicle 309 Load 89%? Last seen 4:41

2: 11 - 13 Mins
at . 3:04 behind Vehicle 1188-1196 Load 98%?

3: 29 - 32 Mins
at . 2:20 behind Vehicle 1183-1191 Load 81%?

C Line notice: Now thru Oct 27 from open-9pm, service will operate every 16 minutes due to power system upgrades. Trains share 1 track at Willowbrook/Rosa Park and Long Beach Blvd Station. Started Tue Sep 3 Until Sun Oct 27 (Updated Mon Sep 9 )

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.