Current time: Refresh

Agencies » Los Angeles Metro

Remove ads by becoming a Premium User

 • : Metro A Line at Anaheim Street Station

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 23 - 28 Mins
at . 5:16 behind Vehicle 1158-1172 Load 123%? Downtown Long Beach Station

2: 37 - 43 Mins
at . 0:09 behind Vehicle 1102-1105-1109 Load 99%? Downtown Long Beach Station

3: 57 - 1h06 Mins
at . 1:13 behind Vehicle 1177-1182-1195 Load 101%?

4: 1h15 - 1h23 Mins
at . 1:38 ahead of Vehicle 1129-1135-1137 Load 118%?

A Line: Fri June 21 from 10:00 AM to 2:00 PM, every 12 minutes due to maintenance. Trains share 1 track at Monrovia Station. Starts Until Jun 21 (Updated Jun 20 )
A Line: Sat Jun 22 from 7:00 AM to 2:00 PM, every 18 minutes due to maintenance. Trains share 1 track at South Pasadena Station and Fillmore Station. Starts Jun 22 Until Jun 22 (Updated Jun 17 )

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.