Current time: Refresh

Agencies » Sydney Trains

Remove ads by becoming a Premium User

 • : T5-Cumberland Line at Warwick Farm Station

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 16 Mins
at . 1:22 ahead of Vehicle 7056.5468.5861.1046 Load 404%? Platform 2 Leppington

2: 48 Mins
at . 0:57 behind Vehicle 3737.8223.1955.7994 Load 108%? Platform 2 Leppington

3: 1h03 Mins
at . 0:00 behind Vehicle 1641 Load 50%? Platform 2 Leppington In long layover, last seen 1:30

4: 1h03 Mins
at . 0:00 behind Vehicle 4182.8884.2101.6118.7067.2554.8937.6979 Load 0%? Many Seats Platform 2 Leppington

5: 1h26 Mins
at . 0:00 behind Vehicle 2670.7898.1148.4193.4428.3304.8551.3744 Load 77%? Platform 2 Leppington

Running late Started Sun Jul 17 2022
due to a person needing medical assistance at Central.
General update Started Fri Jul 22 2022
The 2nd carriage is unavailable. Please move along the platform to board another available carriage.

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.