Current time: Refresh

Agencies » Durham Region Transit

Remove ads by becoming a Premium User

 • : 900-PULSE 900 at Thickson on Dundas

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: At Stop 3:40 behind Vehicle 1014 Load 99%? B - Pickering Parkway Terminal

2: 9 Mins
at . 4:09 behind Vehicle 6121 Load 92%? B - Pickering Parkway Terminal

3: 12 - 19 Mins
at . 2:06 behind Vehicle 9101 Load 30%? Scarborough In long layover, last seen 21:36

4: 13 Mins
at . 12:29 ahead of Vehicle 1011 Load 4%? B - Pickering Parkway Terminal

5: 35 Mins
at . 0:00 behind Vehicle 8612 Load 112%? B - Pickering Parkway Terminal

DRT Service Started Aug 29 2023 Until Sep 5 2023
Durham Region Transit has resumed regular service.

Service updates take effect on September 5.

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.