Current time: Refresh

Agencies » Sydney Trains

Remove ads by becoming a Premium User

 • : T5-Cumberland Line at Warwick Farm Station going Schofields

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 3 Mins
at . 0:49 behind Vehicle 3314.4322.1771.6531 Load 166%? Platform 1 Last seen 1:10

2: 5 Mins
at . 2:03 behind Vehicle 3857 Load 7%? Platform 1 In long layover, last seen 21:43

3: 33 Mins
at . 0:00 behind Vehicle 1010.9173.5556.5291.5173.1532.9782.8760 Load 147%? Many Seats Platform 1 Last seen 8:06

4: 1h08 Mins
at . 5:01 behind Vehicle 6479 Load 184%? Platform 1 In long layover, last seen 57:38

5: 1h23 Mins
at . 20:17 behind Vehicle 3145.2014.4987.7383.9040.1761.1094.2550 Load 80%? Platform 1

Running late Started Jul 17 2022
due to a person needing medical assistance at Central.
General update Started Jul 22 2022
The 2nd carriage is unavailable. Please move along the platform to board another available carriage.

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.