Current time: Refresh

Agencies » Los Angeles Metro

Remove ads by becoming a Premium User

 • : 20-Downtown L- Santa Monica Via Wilshire Bl at Witmer on 6th going

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 8 Mins
at . 10:20 behind Vehicle 1702 Load 146%?

2: 11 - 21 Mins
at . 4:24 behind Vehicle 1589 Load 27%?

3: 22 - 36 Mins
at . Waiting 11:25. 6:31 behind Vehicle 5723 Load 59%?

4: 35 - 48 Mins
at . 8:24 behind Vehicle 1877 Load 116%?

5: 41 - 56 Mins
at . 2:22 behind Vehicle 5832 Load 50%?

Wilshire / Willaman stop moving until further notice due to construction. Started Tue Jan 3 2023 (Updated Sun Jun 23 )
More...
The following stop is closed due to construction: Wilshire / La Jolla Started Fri May 31 (Updated Sun Jun 23 )
Affected routes:
20
The following stop is closed due to construction: Wilshire / Masselin (Eastbound) Started Thu Jun 20 (Updated Thu Jun 27 )
Affected routes:
20
LINES 20 and 70 detoured from Sat Jul 20 at 12:00 AM to Fri Jan 31 at 4:00 PM due to purple line extension construction. The following stops are affected: Wilshire Blvd. & Bonsall Ave. (Westbound) Started Fri Jul 19 Until Fri Jan 31 (Updated Fri Jul 19 )
More...
The following stop is closed due to construction: Wilshire / Glendon (Westbound) Started Tue Jul 30 (Updated Tue Aug 6 )
Affected routes:
20
720
Line 20 Eastbound – trip departing from Wilshire & Highland at 3:02pm will now depart 3:06pm due to a change in school dismissal time. Started Mon Aug 12 (Updated Mon Aug 19 )
Please call Metro Information Center for exact days of operation on these trips.
The following stop is closed until Tue Dec 31 at 4:00 PM due to construction: Wilshire / Glendon (westbound) Started Thu Aug 22 Until Tue Dec 31 (Updated Thu Aug 22 )
Affected routes:
20
720

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.