Current time: Refresh

Agencies » Sydney Trains

Remove ads by becoming a Premium User

 • : T5-Cumberland Line at Warwick Farm Station

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 14 Mins
at . 24:25 behind Vehicle 8881.1513.5658.5753 Load 179%? Platform 2 Leppington Last seen 1:17

2: 21 Mins
at . 1:50 behind Vehicle 3331.4985.5312.6382 Load 25%? Platform 2 Leppington Last seen 2:00

3: 1h01 Mins
at . 0:00 behind Vehicle 5861.4856.6632.5687 Load 134%? Platform 2 Leppington Last seen 8:44

4: 1h04 Mins
at . 2:49 behind Vehicle 1355 Load 9%? Platform 2 Leppington In long layover, last seen 9:19

Running late Started Sun Jul 17 2022
due to a person needing medical assistance at Central.
General update Started Fri Jul 22 2022
The 2nd carriage is unavailable. Please move along the platform to board another available carriage.

Vehicle 5104 aprchg Leppington Station heading West

Vehicle 2312 aprchg Leppington Station heading West

Vehicle 1355 aprchg Schofields Station heading North

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.