Current time: Refresh

Agencies » Washington WMATA

Remove ads by becoming a Premium User

 • : Metrorail Blue Line at Benning Road, Blue/Silver Line Center Platform going Largo

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 1:24 - 2 Mins
at . 5:57 behind Vehicle 433 Load 120%? Empty

2: 10 - 13 Mins
at . 3:34 behind Vehicle 401 Load 105%? Empty

3: 23 Mins
at . Added 3:38 behind Vehicle 451 Load 67%? Empty

4: 24 - 38 Mins
at . 7:52 behind Vehicle 403 Load 217%? Empty

5: 34 - 1h03 Mins
at . Added 22:39 behind Vehicle 405 Load 98%? Empty

Expect residual delays in both directions following an earlier signal problem outside Van Dorn Street. Some trains will offload at strategic locations to minimize congestion.
Expect residual delays in both directions following an earlier signal problem outside Van Dorn Street. Some trains will offload at strategic locations to minimize congestion.

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.