Current time: Refresh

Agencies » Sydney Trains

Remove ads by becoming a Premium User

 • : T5-Cumberland Line at Warwick Farm Station going Schofields

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 0:06 Mins
at . 0:00 behind Vehicle 9732 Load 203%? Platform 1 In long layover, last seen 29:56

2: 19 Mins
at . 0:00 behind Vehicle 9760 Load 63%? Platform 1 In long layover, last seen 8:31

3: 19 Mins
at . 0:00 behind Vehicle 8144.9631.7838.4206 Load 0%? Platform 1 Last seen 7:53

4: 54 Mins
at . 5:27 behind Vehicle 9447.8726.9837.1975 Load 118%? Platform 1

5: 1h21 Mins
at . 2:17 behind Vehicle 5040 Load 89%? Platform 1 In long layover, last seen 44:18

Running late Started Jul 17 2022
due to a person needing medical assistance at Central.
General update Started Jul 22 2022
The 2nd carriage is unavailable. Please move along the platform to board another available carriage.

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.