Current time: Refresh

Agencies » Washington WMATA

Remove ads by becoming a Premium User

 • : Metrorail Blue Line at Crystal City, Yellow/Blue Line Track 2 Platform going Franconia-Springfield

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 6 - 9 Mins
at . 12:36 behind Vehicle 448 Load 86%? Empty

2: 15 - 18 Mins
at . 8:23 behind Vehicle 402 Load 107%? Empty

3: 22 - 25 Mins
at . 0:18 behind Vehicle 404 Load 91%? Empty

4: 44 - 54 Mins
at . 6:59 behind Vehicle 408 Load 93%? Empty

Normal service has resumed at Addison Rd.
Normal service has resumed at Addison Rd.
Trains are single tracking btwn Foggy Bottom & Arlington Cemetery and Foggy Bottom & Clarendon due to a signal problem outside Rosslyn. Expect delays in both directions.
Trains are single tracking btwn Foggy Bottom & Arlington Cemetery and Foggy Bottom & Clarendon due to a signal problem outside Rosslyn. Expect delays in both directions.

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.