Current time: Refresh

Agencies » Calgary Transit


Starting Monday, April 29 through Friday, May 10 from 9 a.m. to 3 p.m. daily, Country Village Way N.E. @ Harvest Hills Boulevard N. will be closed for construction. Routes 86 and 114 will be detoured.



Route 86 will travel:



  • West on Country Village Way N.E.

  • North on Country Village Link N.E.

  • West on North Pointe Cut-Through

  • North on Harvest Hills Boulevard N., resume regular routing.



Route 114 will travel:



  • South on Country Village Link N.E.

  • West on North Pointe Cut-Through

  • North on Harvest Hills Boulevard N., resume regular routing.



The following stops will be temporarily closed:



  • North Pointe Terminal E (#3496)

  • North Pointe Terminal A (#4100) - Route 114



Please use the following stop in lieu of the closed stops:



  • North Pointe Terminal H (#2898)

Started Apr 29 Until May 10

Remove ads by becoming a Premium User

 • : 114-Panorama/Country Hills at 78 AV NW Terminal on WB going Panorama/Country Hills

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination


Starting Monday, April 29 at 9 a.m. through Friday, June 28 at 3 p.m., Centre Street N. @ Beddington Boulevard N.W. will have a closure for North Central BRT construction. Routes 2, 88, 114, 300, 301, 736, 738 and 739 will have stop closures.



The following stops at SB Centre ST N. @ N. of Beddington BV N. will be temporarily closed:



  • #4590 - Routes 300, 301, 736, 738 & 739

  • #5904 - Routes 88 & 114

  • #8635 - Route 2



Please use the following stop in lieu of the closed stops:



  • SB Centre ST N. @ N. of Beddington BV N. - 85m north of closed stop

Started Apr 29 Until Jun 28

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.