Current time: Refresh

Agencies » Calgary Transit


Starting Friday, May 3 at 9 a.m. through Sunday, May 7 at 7 p.m., there will be a road closure at 16 Street S.W. between 38 Avenue S.W. at 40 Avenue S.W. for construction work. Route 13 will be detoured.



Westbound route 13 will travel:



  • From west on 38 Avenue S.W.

  • South on 15A Street S.W.

  • West on 40 Avenue S.W.

  • South on 16 Street S.W., resume regular routing



Eastbound route 13 will travel:



  • From north on 16 Street S.W.

  • East on 40 Avenue S.W.

  • North on 15A Street S.W.

  • East on 38 Avenue S.W., resume regular routing




The following stops will be temporarily closed:



  • SB 16 ST S.W. @ 38 AV S.W. (#4701)

  • NB 16 ST S.W. @ 40 AV S.W. (#4684)

  • EB 38 AV S.W. @ 16 ST S.W. (#4683)



Please use the following stops in lieu of the closed stops:



  • WB 38 AV S.W. @ 15 ST S.W. (#4702)

  • SB 16 ST S.W. @ 40 AV S.W. (#4700)

  • EB 40 AV S.W. @ 16 ST S.W. (far side detour stop)

  • EB 38 AV S.W. @ 15A ST S.W. (far side detour stop)

Started Until May 7

Remove ads by becoming a Premium User

 • : 13-Altadore at Richard RD on EB 50 AV SW going City Centre

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 23 - 26 Mins
at . 2:02 behind Vehicle 7929 Load 114%?

2: 50 - 52 Mins
at . 1:08 ahead of Vehicle 7796 Load 89%?

3: 1h23 - 1h32 Mins
at . Waiting 6:34. 4:58 behind Vehicle 8013 Load 124%?

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.