Current time: 12:54:00PM Refresh
Starting Monday, April 22 at 9 a.m. through Sunday, May 13 at 5 p.m., the two left lanes on 5 Street S.W. @ 9 Avenue S.W. will be closed for construction. Routes 101, 300, and 302 will be detoured.
Routes 101, 300, and 302 will travel:
No stops are affected by this detour.
Remove ads by becoming a Premium User
• : 300-BRT Airport/City Centre at 40 AV N on NB Centre ST N going ↑Brt Airport
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 10 - 13 Mins at 1:04:00PM. 4:53 behind 1:01:00PM Vehicle 8301 Load 117%? Last seen 1:04
2: 33 - 40 Mins at 1:27:14PM. 0:24 ahead of 1:30:00PM Vehicle 8303 Load 79%? ↩ Last seen 1:00
3: 1h06 - 1h15 Mins at 2:00:00PM. 1:03 behind 2:01:00PM Vehicle 8307 Load 108%? ↩
Starting Monday, April 29 at 9 a.m. through Friday, June 28 at 3 p.m., Centre Street N. @ Beddington Boulevard N.W. will have a closure for North Central BRT construction. Routes 2, 88, 114, 300, 301, 736, 738 and 739 will have stop closures.
The following stops at SB Centre ST N. @ N. of Beddington BV N. will be temporarily closed:
Please use the following stop in lieu of the closed stops:
Starting Monday, April 22 at 9 a.m. through Wednesday, May 15 at 3 p.m., there will be lane closures at 40 Avenue N.W. @ Centre Street N. for construction. Routes 3, 62, 64, 109, 116, 142, 300 and 301 will have stop closures.
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.