Current time: 3:15:00PM Refresh
Remove ads by becoming a Premium User
• : 301-BRT North/City Centre at Harvest Oak DR NE on NB Harvest Hills BV going ↑301 North
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 4 - 6 Mins at 3:19:06PM. 1:43 ahead of 3:22:00PM Vehicle 6031 Load 99%? Last seen 1:04
2: 11 - 15 Mins at 3:26:56PM. 3:25 ahead of 3:32:00PM Vehicle 6074 Load 87%? Last seen 1:16
3: 24 - 29 Mins at 3:39:54PM. 0:10 behind 3:42:00PM Vehicle 6067 Load 96%? Last seen 1:09
4: 28 - 33 Mins at 3:43:41PM. 1:14 ahead of 3:47:00PM Vehicle 6089 Load 41%? Last seen 1:12
5: 36 Mins at 3:51:15PM. 0:45 ahead of 3:52:00PM Vehicle 6053 Load 153%? Last seen 1:13
Starting Monday, April 29 at 9 a.m. through Friday, June 28 at 3 p.m., Centre Street N. @ Beddington Boulevard N.W. will have a closure for North Central BRT construction. Routes 2, 88, 114, 300, 301, 736, 738 and 739 will have stop closures.
The following stops at SB Centre ST N. @ N. of Beddington BV N. will be temporarily closed:
Please use the following stop in lieu of the closed stops:
Starting Wednesday, May 1 through Friday, May 24 at 7 a.m., there will be left lane closures at 6 Avenue S.W. between 2 Street and 4 Street S.W. for Green Line construction work. Routes 1, 3, 6, 17, 22, 66, 101, 301, 302 & MAX Yellow will have stop closures.
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Starting Monday, April 22 at 9 a.m. through Wednesday, May 15 at 3 p.m., there will be lane closures at 40 Avenue N.W. @ Centre Street N. for construction. Routes 3, 62, 64, 109, 116, 142, 300 and 301 will have stop closures.
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.