Current time: 9:17:56PM Refresh
Remove ads by becoming a Premium User
• : 301-BRT North/City Centre at 64 AV N on SB Centre ST N going ↓City Centre
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 0:29 Mins at 9:18:24PM. 0:14 ahead of 9:19:00PM Vehicle 8511 Load 99%?
2: 19 - 24 Mins at 9:37:40PM. 0:22 behind 9:39:00PM Vehicle 8448 Load 103%? ↩
3: 39 - 44 Mins at 9:57:49PM. 0:36 behind 9:59:00PM Vehicle 8441 Load 101%? ↩
4: 59 - 1h04 Mins at 10:17:02PM. 1:40 behind 10:17:00PM Vehicle 8399 Load 95%? ↩
5: 1h17 - 1h22 Mins at 10:35:33PM. 0:35 behind 10:37:00PM Vehicle 8511 Load 95%? ↩
Starting Monday, April 29 at 9 a.m. through Friday, June 28 at 3 p.m., Centre Street N. @ Beddington Boulevard N.W. will have a closure for North Central BRT construction. Routes 2, 88, 114, 300, 301, 736, 738 and 739 will have stop closures.
The following stops at SB Centre ST N. @ N. of Beddington BV N. will be temporarily closed:
Please use the following stop in lieu of the closed stops:
Starting Wednesday, May 1 through Friday, May 24 at 7 a.m., there will be left lane closures at 6 Avenue S.W. between 2 Street and 4 Street S.W. for Green Line construction work. Routes 1, 3, 6, 17, 22, 66, 101, 301, 302 & MAX Yellow will have stop closures.
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Starting Monday, April 22 at 9 a.m. through Wednesday, May 15 at 3 p.m., there will be lane closures at 40 Avenue N.W. @ Centre Street N. for construction. Routes 3, 62, 64, 109, 116, 142, 300 and 301 will have stop closures.
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.