Current time: 9:39:20AM Refresh
Remove ads by becoming a Premium User
• : 43-McKnight - Westwinds Station/Chinook Station at 70 AV SE on NB 11 ST SE going ↓Chinook Station
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 1:34 - 3 Mins at 9:40:54AM. 0:33 ahead of 9:42:00AM Vehicle 7865 Load 93%?
2: 11 - 13 Mins at 9:50:53AM. 0:15 ahead of 9:52:00AM Vehicle 8513 Load 110%?
3: 20 - 23 Mins at 9:59:54AM. 0:07 ahead of 10:01:00AM Vehicle 7819 Load 89%?
4: 31 - 35 Mins at 10:10:25AM. 1:50 behind 10:11:00AM Vehicle 8401 Load 122%?
5: 53 - 59 Mins at 10:33:09AM. 5:41 behind 10:30:00AM Vehicle 8358 Load 229%?
Starting Monday, April 22 at 7 a.m. through Friday, June 14 at 7 p.m., the northbound right-hand lane on Ogden Road S.E. @ 78 Avenue S.E. will be closed for construction and 2-way traffic will be set up on the southbound lane. Routes 43, 117, 131, 151, 302 and 779 will have stop closures.
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.