Starting Friday, May 3 at 6 p.m. through Monday, May 6 at 5 a.m., northbound 85 Street S.W. between Wentworth Drive & 9 Avenue S.W. will be closed for construction. Routes 98 and 699 will have stop closures.
The following stops will be temporarily closed:
- NB 85 ST SW @ Wentworth DR SW (Stop: #3714)
Please use the following stops in lieu of the closed stops:
- NB 85 ST SW @ Wentworth DR SW (Nearside Temporary Stop*, 100 m South of Wentworth DR SW)
Started May 3
Until May 6