Current time: Refresh

Agencies » Calgary Transit

Remove ads by becoming a Premium User

 • : 98-Cougar Ridge at 69 Street West LRT Station going 69 St Station

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 18 - 31 Mins
at . 4:57 behind Vehicle 1210 Load 94%?

2: 54 - 1h03 Mins
at . 4:41 behind Vehicle 1210 Load 99%?

3: 1h29 - 1h37 Mins
at . 4:56 behind Vehicle 1210 Load 101%?


Starting Friday, May 3 at 6 p.m. through Monday, May 6 at 5 a.m., northbound 85 Street S.W. between Wentworth Drive & 9 Avenue S.W. will be closed for construction. Routes 98 and 699 will have stop closures.


The following stops will be temporarily closed:



  • NB 85 ST SW @ Wentworth DR SW (Stop: #3714)


Please use the following stops in lieu of the closed stops:



  • NB 85 ST SW @ Wentworth DR SW (Nearside Temporary Stop*, 100 m South of Wentworth DR SW)

Started May 3 Until May 6

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.