Current time: Refresh

Agencies » Des Moines DART

Detour due to construction. goto ridedart.com for details. Started Tue Apr 9 Until Wed Jan 1 3000
Detour due to construction. goto ridedart.com for details.
Stop Closure on Route 7 INBOUND Started Tue Apr 9 Until Wed Jan 1 3000
Stop Closure between Route 7 INBOUND at --- and Route 7 INBOUND at ---
Stop Closure on Route 7 OUTBOUND Started Tue Apr 9 Until Wed Jan 1 3000
Stop Closure between Route 7 OUTBOUND at --- and Route 7 OUTBOUND at ---

Remove ads by becoming a Premium User

 • : 7-S9th St at Southridge Mall, Dsm

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 11 - 19 Mins
at . 0:23 behind Vehicle 1412 Load 49%? Southridge Mall

2: 49 - 52 Mins
at . 1:50 behind Vehicle 1034 Load 197%? Southridge Mall Via County Line

3: 1h29 - 1h34 Mins
at . 1:25 behind Vehicle 1617 Load 232%? Southridge Mall Via County Line

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.