Current time: Refresh

Agencies » Houston METRO

Route 028 OST - Wayside detoured due to construction ^M Started Jan 12
Affected direction: Eastbound

28 OST Wayside E/B- Via Wayside, Right 1st exit (Clinton/Harbor), veer left to Clinton, Left Clinton to reg route.

Remove ads by becoming a Premium User

 • : 028-Ost - Wayside at Magnolia Transit Center going Ben Taub Hospital

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 31 - 40 Mins
at . Waiting 5:06. 6:07 behind Vehicle 3603 Load 222%? Last seen 5:06

Route 028 detoured at S Wayside Dr @ Lawndale St due to construction. ^A Started Until
Affected stops:
S Wayside Dr @ Lawndale St - Stop #817 (eastbound)
Route 028 experiencing delays at Ben Taub Loop.
SAFETY TIP: Don't leave bags and packages unattended. ^A
Started Until
Affected stops:
Ben Taub Loop

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.