• : Metro C Line at El Segundo Station going
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 22 Mins
at . 0:02 behind Vehicle block_303_schedBasedVehicle
2: 49 Mins
at . 2:02 behind Vehicle block_304_schedBasedVehicle
3: 1h28 - 1h31 Mins
at . 1:17 behind Vehicle 1194-1208 ↩
C Line notice: Now thru Oct 27 from open-9pm, service will operate every 16 minutes due to power system upgrades. Trains share 1 track at Willowbrook/Rosa Park and Long Beach Blvd Station. Started Tue Sep 3 Until Sun Oct 27 (Updated Mon Sep 9 )
Add stop (different agency)