Current time: Refresh

Agencies » Los Angeles Metro

LINE 18: Buses will start using the 6th St. bridge starting Sunday, July 17. Started Jul 17 2022 (Updated Dec 11 )

Remove ads by becoming a Premium User

 • : 18-Wilshire Western Sta-Montebello Via 6th - Whittier at Wall on 6th going Montebello Metrolink Station

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 0:44 Mins
at . 0:02 behind Vehicle 1853 Load 95%?

2: 11 Mins
at . 4:37 behind Vehicle 5677 Load 149%?

3: 18 Mins
at . 5:30 behind Vehicle 3887 Load 114%?

4: 18 Mins
at . 0:13 behind Vehicle 1931 Load 39%?

5: 21 - 29 Mins
at . 0:21 ahead of Vehicle 1706 Load 75%?

LINE 18 detoured from Wed May 1 to Fri May 17 every from 8:00 AM to 4:00 PM due to construction. The following stops are affected: 6th between Alexandria and Normandie (Westbound) Starts May 13 Until May 17 (Updated May 5 )
Westbound: Regular route 6th St. and Kenmore Ave., then continue via 6th St., to L-Alexandria Ave., R-Wilshire Blvd., R-Normandie Ave., L-6th St., and regular route.

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.