Current time: Refresh

Agencies » Los Angeles Metro

LINE 18: Buses will start using the 6th St. bridge starting Sunday, July 17. Started Jul 17 2022 (Updated Dec 11 )

Remove ads by becoming a Premium User

 • : 18-Wilshire Western Sta-Montebello Via 6th - Whittier at Ditman on Whittier

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: At Stop 1:03 ahead of Vehicle 1746 Load 159%? Oxford Terminal on 6th

2: 6 Mins
at . 18:28 ahead of Vehicle 1931 Load 100%? Oxford Terminal on 6th

3: 9 Mins
at . 14:41 behind Vehicle 3923 Load 142%? Vermont Station on Wilshire

4: 13 Mins
at . Waiting 5:05. 1:02 behind Vehicle 5677 Load 76%? Oxford Terminal on 6th

5: 21 Mins
at . 2:32 behind Vehicle 6052 Load 141%? Vermont Station on Wilshire Last seen 1:12

LINE 18 detoured from Wed May 1 to Fri May 17 every from 8:00 AM to 4:00 PM due to construction. The following stops are affected: 6th between Alexandria and Normandie (Westbound) Started Until May 17 (Updated May 5 )
Westbound: Regular route 6th St. and Kenmore Ave., then continue via 6th St., to L-Alexandria Ave., R-Wilshire Blvd., R-Normandie Ave., L-6th St., and regular route.

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.