Current time: Refresh

Agencies » Los Angeles Metro

Remove ads by becoming a Premium User

 • : 206-Hollywood - Athens Via Normandie Av at Vermont Station Layover going Vermont on Fountain

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 4 Mins
at . Waiting 6:18. 0:00 behind Vehicle 1593 Load 310%?

2: 20 Mins
at . 0:00 behind Vehicle 6019 Load 107%?

3: 35 Mins
at . 0:00 behind Vehicle 5885 Load 100%?

4: 50 Mins
at . 0:00 behind Vehicle 1890 Load 100%?

5: 1h15 Mins
at . 0:00 behind Vehicle 1908 Load 167%?

The following stop is closed until Fri May 3 at 4:00 PM due to construction: Vermont / 119th (Southbound) Started Apr 2 Until May 3 (Updated )
Affected routes:
204
206

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.