Current time: Refresh

Agencies » Los Angeles Metro

Remove ads by becoming a Premium User

 • : 51-Westlake/Mcarthur Pk Sta-Dtwn Lcsu Dh Via Avalon at Main on 7th going Wilshire on Westlake

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 2 Mins
at . 3:41 behind Vehicle 5916 Load 115%?

2: 7 Mins
at . 1:59 ahead of Vehicle 5705 Load 35%?

3: 19 Mins
at . 0:03 behind Vehicle 5675 Load 91%?

4: 28 Mins
at . 0:38 ahead of Vehicle 4057 Load 85%?

5: 35 Mins
at . 21:51 ahead of Vehicle 6060 Load 45%?

LINE 51 detoured until Mon Jun 10 at 4:00 PM due to construction. The following stops are affected: 7th St. between Spring St. and Broadway Started Apr 9 Until Jun 10 (Updated Apr 9 )
Northbound: Regular route 7th St. and Los Angeles St., then continue via 7th St., to R-Main St., L-5th St., L-Broadway, R-7th St., and regular route.

Southbound: Regular route. 7th St. and Hill St., then continue via 7th St., to R-Broadway, L-9th St., L-Main St., R-7th St., and regular route.
LINES 35/38 and 51 detoured until Mon Jun 10 at 4:00 PM due to construction. Started Apr 11 Until Jun 10 (Updated Apr 11 )
More...

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.