• : 61-Mavis at Waterford Cres Walkway on Mavis Rd going
1:
14 Mins
at
. Vehicle 2280 Load
112%?past Duke Of York Blvd on Rathburn Rd
2:
15 Mins
at
.
1:22 behind Vehicle 2280 Load
7%? ↩past Duke Of York Blvd on Rathburn Rd
3:
34 Mins
at
. Vehicle 1903 Load
110%?past Sheridan College Brampton Campus
4:
41 Mins
at
.
7:23 behind Vehicle 1903 Load
38%? ↩past Sheridan College Brampton Campus
61 Mavis Started Wed Oct 30 2024 Until Wed Dec 31
61 North - Stop 6110 on Mavis Rd at Rodeo Dr is relocated 90 metres north for construction.103 Hurontario Express Started Mon Jan 6 2025 Until Wed Dec 31
103 South - Stop 0723 on Hurontario St at the Queensway is relocated 25 metres south for LRT construction. The shelter will remain accessible for use.Add stop (different agency)