Current time: Refresh

Agencies » Philadelphia SEPTA

Remove ads by becoming a Premium User

 • : 103-Ardmore to 69th St TC at Grove Pl on Township Line Rd going 69th Street Transportation Center

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 7 - 11 Mins
at . 0:45 ahead of Vehicle 8354 Load 108%?

2: 36 - 41 Mins
at . 0:26 behind Vehicle 3073 Load 101%?

3: 1h20 - 1h23 Mins
at . 2:28 behind Vehicle 3504 Load 144%? In long layover, last seen 13:16

Construction Started Sun Aug 4 Until Tue Aug 5 2025
Sundays Only, NB via 77th Ave, Right on Overbrook, Left on Haverford, Left on City, Left on 77th, Layover
Trip cancellation for trip 0.
Trip cancellation for trip 0.

Vehicle 3504 aprchg 69th St Transit Center North Terminal heading South

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.