Current time: Refresh

Agencies » Philadelphia SEPTA

Remove ads by becoming a Premium User

 • : 108-UPS or Airport to 69th St TC at Philadelphia Airport Terminal D going 69th Street Transportation Center

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 30 - 38 Mins
at . 0:56 behind Vehicle 3274 Load 197%? Last seen 1:04

2: 30 - 37 Mins
at . 30:14 behind Vehicle 3383 Load -2%? Last seen 1:05

3: 1h09 - 1h15 Mins
at . 7:55 behind Vehicle 3471 Load 126%? In long layover, last seen 1:42

Construction Started Wed Sep 18 Until Thu Oct 31
Until 10/31/24, SB via Tinicum, Straight onto the new road, Left on 2nd, Left on Detour Sign, Right on Hog Island, Reg Rt
Construction Started Thu Sep 19 Until Tue Dec 31
Until 12/31/24, NB via Hog Island Rd, Straight onto Tinicum Rd, Reg Rt
Trip cancellation for trip 0.
Trip cancellation for trip 0.

Vehicle 3471 at Ludlow St on 69th St heading North

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.