Current time: Refresh

Agencies » Philadelphia SEPTA

Remove ads by becoming a Premium User

 • : 14-FTC to Nesh/Oxford Valley Malls at Tomlinson Rd - FS on Roosevelt Blvd

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 0:54 Mins
at . 2:14 ahead of Vehicle 7442 Load 80%? Many Seats Available Frankford Transportation Center

2: 23 - 30 Mins
at . Waiting 6:16. 3:44 behind Vehicle 7366 Load 88%? Empty Frankford Transportation Center Last seen 1:16

3: 38 - 47 Mins
at . Waiting 11:15. 0:11 behind Vehicle 7369 Load 82%? Empty Frankford Transportation Center

4: 1h07 - 1h13 Mins
at . 8:19 behind Vehicle 7443 Load 141%? Frankford Transportation Center

5: 1h25 - 1h36 Mins
at . 7:26 behind Vehicle 7370 Load 96%? Frankford Transportation Center

construction Started May 3 2023 Until Dec 30 2024
Discontinued, NB transit stop at Rockhill, & Rt 1 South until further, notice
Construction Started Sep 16 2022 Until Sep 13 2025
NB via Middletown Blvd, Right on Access Rd (Behind the, Firestone), Left on Access Rd (JC Penney), Left on 1st Access Rd, Take recovery near JC, Penney
Construction Started Sep 16 2022 Until Sep 13 2025
SB via Access Rd, Right on Middletown Blvd, Reg Rt
Construction Started Sep 16 2022 Until Sep 13 2025
Sesame Place Trips, SB via Middletown Blvd, Left on Access Rd (Behind, Firestone), Left on Access Rd (JC Penney), Left on 1st Access Rd, Right on Middletown Blvd, Reg Rt
Construction Started Sep 16 2022 Until Sep 13 2025
Sesame Place Trips, NB via Middletown Blvd, Left on Access Rd (Behind the, Firestone), Left on Access Rd (JC Penney), Left on 1st Access Rd, Right on Middletown Blvd, Reg Rt

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.