Current time: Refresh

Agencies » Philadelphia SEPTA

Remove ads by becoming a Premium User

 • : 14-FTC to Nesh/Oxford Valley Malls at Rhawn St on Roosevelt Blvd

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 3 - 6 Mins
at . 5:22 behind Vehicle 7370 Load 145%? Few Seats Available Frankford Transportation Center

2: 26 - 37 Mins
at . 7:18 behind Vehicle 7452 Load 213%? Empty Frankford Transportation Center

3: 54 - 1h16 Mins
at . Waiting 25:43. 7:11 behind Vehicle 7368 Load 227%? Empty Frankford Transportation Center Last seen 1:14

4: 1h16 - 1h32 Mins
at . 12:04 behind Vehicle 7369 Load 272%? Frankford Transportation Center

construction Started May 3 2023 Until Dec 30 2024
Discontinued, NB transit stop at Rockhill, & Rt 1 South until further, notice
Construction Started Sep 16 2022 Until Sep 13 2025
NB via Middletown Blvd, Right on Access Rd (Behind the, Firestone), Left on Access Rd (JC Penney), Left on 1st Access Rd, Take recovery near JC, Penney
Construction Started Sep 16 2022 Until Sep 13 2025
SB via Access Rd, Right on Middletown Blvd, Reg Rt
Construction Started Sep 16 2022 Until Sep 13 2025
Sesame Place Trips, SB via Middletown Blvd, Left on Access Rd (Behind, Firestone), Left on Access Rd (JC Penney), Left on 1st Access Rd, Right on Middletown Blvd, Reg Rt
Construction Started Sep 16 2022 Until Sep 13 2025
Sesame Place Trips, NB via Middletown Blvd, Left on Access Rd (Behind the, Firestone), Left on Access Rd (JC Penney), Left on 1st Access Rd, Right on Middletown Blvd, Reg Rt

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.