Current time: Refresh

Agencies » Philadelphia SEPTA

Remove ads by becoming a Premium User

 • : 14-FTC to Nesh/Oxford Valley Malls at Mast Charter School

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

Construction Started Mon Aug 5 Until Mon Oct 7
until 4pm on 10/7/24, SB via Bustleton Ave, Right on Bridge St, Left on Penn St, Left on into Pratt St Alley, drop off on the Route R and, Rt 8 stand in front of the, Supervisor Booth
PENN DOT Started Sun Sep 8 Until Sun Dec 15
Oxford Valley Mall Trips, via Neshaminy Mall Only, NB via Rockhill Dr, Right on South US Rt 1 ramp to, US Rt 1, Right on exit for Street Rd, Right on Street Rd, Right on US Rt 1 North Ramp to, US Rt1 North, Reg Rt
construction Started Wed May 3 2023 Until Tue Dec 31
Discontinued, NB transit stop at Rockhill, & Rt 1 South until further, notice
Construction Started Fri Sep 16 2022 Until Sat Sep 13 2025
Sesame Place Trips, NB via Middletown Blvd, Left on Access Rd (Behind the, Firestone), Left on Access Rd (JC Penney), Left on 1st Access Rd, Right on Middletown Blvd, Reg Rt
Construction Started Fri Sep 16 2022 Until Sat Sep 13 2025
Sesame Place Trips, SB via Middletown Blvd, Left on Access Rd (Behind, Firestone), Left on Access Rd (JC Penney), Left on 1st Access Rd, Right on Middletown Blvd, Reg Rt
Trip cancellation for trip 0.
Trip cancellation for trip 0.

Vehicle 7408 at Bucks County Technology Park - 1 heading East

Vehicle 7442 aprchg Van Kirk St on Bustleton Av heading South

Vehicle 7439 aprchg Woodbourne Rd on Maple Ave PA 213 heading East

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.