Current time: Refresh

Agencies » Philadelphia SEPTA

Remove ads by becoming a Premium User

 • : 20-Philadelphia Mills to FTC at Byberry Rd on Academy Rd

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 4 - 10 Mins
at . 1:21 behind Vehicle 8501 Load 78%? Empty Frankford Transportation Center

2: 20 - 23 Mins
at . 0:06 behind Vehicle 8190 Load 79%? Frankford Transportation Center via Keswick

3: 44 - 51 Mins
at . 1:21 behind Vehicle 3377 Load 121%? Frankford Transportation Center Last seen 1:02

4: 1h06 Mins
at . 0:25 ahead of Vehicle 8175 Load 101%? Frankford Transportation Center In long layover, last seen 25:37

Construction Started Mon Aug 5 Until Mon Oct 7
until 4pm on 10/7/24, SB via Bustleton Ave, Right on Bridge St, Left on Penn St, Left on into Pratt St Alley, drop off on the Route R and, Rt 8 stand in front of the, Supervisor Booth
Trip cancellation for trip 0.
Trip cancellation for trip 0.

Vehicle 8175 past Cheltenham Av on Bustleton Av heading South

Vehicle 3366 at Van Kirk St on Bustleton Av heading South

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.