Current time: Refresh

Agencies » Philadelphia SEPTA

Remove ads by becoming a Premium User

 • : 20-Philadelphia Mills to FTC at Ryan High School South Entrance on Academy Rd

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 27 - 34 Mins
at . 11:50 behind Vehicle 3174 Load 175%? Empty Philadelphia Mills via Keswick

2: 33 - 42 Mins
at . 5:17 behind Vehicle 8175 Load 45%? Philadelphia Mills In long layover, last seen 21:01

3: 1h12 - 1h20 Mins
at . 16:45 behind Vehicle 3180 Load 169%? Philadelphia Mills via Keswick

4: 1h15 - 1h24 Mins
at . 4:57 behind Vehicle 8187 Load 25%? Philadelphia Mills Last seen 1:49

Construction Started Mon Aug 5 Until Mon Oct 7
until 4pm on 10/7/24, SB via Bustleton Ave, Right on Bridge St, Left on Penn St, Left on into Pratt St Alley, drop off on the Route R and, Rt 8 stand in front of the, Supervisor Booth
Trip cancellation for trip 0.
Trip cancellation for trip 0.

Vehicle 8175 aprchg Frankford Transit Center - Main Dropoff heading South

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.