Current time: Refresh

Agencies » Philadelphia SEPTA

Remove ads by becoming a Premium User

 • : 20-Philadelphia Mills to FTC at Exeter Rd on Convent Av

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 13 - 16 Mins
at . 0:29 ahead of Vehicle 3174 Load 144%? Few Seats Frankford Transportation Center Last seen 1:01

2: 35 - 46 Mins
at . 4:19 behind Vehicle 8175 Load 124%? Frankford Transportation Center via Keswick Last seen 1:01

3: 51 - 58 Mins
at . 0:48 ahead of Vehicle 3180 Load 74%? Frankford Transportation Center Last seen 1:02

4: 1h14 - 1h19 Mins
at . 0:19 behind Vehicle 8187 Load 106%? Frankford Transportation Center via Keswick In long layover, last seen 25:03

Construction Started Mon Aug 5 Until Mon Oct 7
until 4pm on 10/7/24, SB via Bustleton Ave, Right on Bridge St, Left on Penn St, Left on into Pratt St Alley, drop off on the Route R and, Rt 8 stand in front of the, Supervisor Booth
Trip cancellation for trip 0.
Trip cancellation for trip 0.

Vehicle 8648 aprchg Frankford Transit Center - Main Dropoff heading South

Vehicle 8187 past Cheltenham Av on Bustleton Av heading West

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.