Current time: Refresh

Agencies » Philadelphia SEPTA

Remove ads by becoming a Premium User

 • : 21-Columbus-Dock to 69th St TC at Walnut St on 2nd St

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 10 - 14 Mins
at . 1:31 ahead of Vehicle 3017 Load 120%? Few Seats Available Columbus-Dock

2: 18 - 23 Mins
at . 4:22 ahead of Vehicle 3653 Load 85%? Standing Room Columbus-Dock

3: 32 - 41 Mins
at . 2:00 behind Vehicle 3012 Load 145%? Many Seats Available Columbus-Dock

4: 58 - 1h02 Mins
at . Waiting 13:23. 5:57 behind Vehicle 3651 Load 124%? Few Seats Available Columbus-Dock Last seen 1:23

5: 1h13 - 1h30 Mins
at . 5:28 behind Vehicle 3669 Load 208%? Columbus-Dock

Construction Started Jan 14 Until Dec 31 2028
Until 1/1/2029, EB via Chestnut, Right on 2nd, Left on Spruce, Left on Columbus Blvd, Left on Dock, take recovery on Dock, between Columbus and, Front
Construction Started Jan 14 Until Dec 31 2028
Unitl 01/01/2029, WB via Dock, Around Dock, Left on Walnut, Reg rte
New Start/End Route Location Effective Jan. 14 Started Jan 13
More...

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.