Current time: Refresh

Agencies » Philadelphia SEPTA

Remove ads by becoming a Premium User

 • : 21-Columbus-Dock to 69th St TC at Glencoe Rd on Market St

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 2 - 4 Mins
at . Waiting 11:54. 3:49 ahead of Vehicle 3651 Load 69%? Few Seats Available Columbus-Dock

2: 28 - 35 Mins
at . 0:58 behind Vehicle 3669 Load 268%? Columbus-Dock

3: 39 - 47 Mins
at . 1:07 behind Vehicle 3051 Load 111%? Columbus-Dock

4: 49 - 54 Mins
at . 0:38 behind Vehicle 8380 Load 95%? Columbus-Dock

5: 1h01 Mins
at . 0:00 behind Vehicle 3010 Load 94%? Columbus-Dock

Construction Started Jan 14 Until Dec 31 2028
Until 1/1/2029, EB via Chestnut, Right on 2nd, Left on Spruce, Left on Columbus Blvd, Left on Dock, take recovery on Dock, between Columbus and, Front
Construction Started Jan 14 Until Dec 31 2028
Unitl 01/01/2029, WB via Dock, Around Dock, Left on Walnut, Reg rte
New Start/End Route Location Effective Jan. 14 Started Jan 13
More...

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.